Insight

From a BIM Clash to an Approved Shop Drawing

A duct clashes with a mullion fixing zone. Follow the decision from the shared model to the drawing used in fabrication.

Illustrative façade, structure and services coordination model
Illustrative façade, structure and services coordination model

Illustrative diagrams · Not to scale

Identify the clash

Record the floor, grid line and model revision. Check both the overlap and the access the installer needs at the connection.

Coordinate the resolution

In this illustrative scenario, the team reroutes the duct to clear the fixing zone. The agreed change is recorded in the RFI and in the coordination model.

Issue the shop drawing

The elevation and section record the agreed positions and access zone. Before release, check that the drawing, model and production data match the approved revision.

Explore BIM and shop drawing coordination