BIM, shop drawings & coordination

All capabilities

Shared technical information for design, fabrication and site teams

Models and shop drawings define geometry, connections, joints and tolerances. We coordinate the façade interfaces with the structure, building services and finishes.

RFIs and material submittals record decisions and approvals. Approved drawings define fabrication dimensions, fixing positions and installation information.

Illustrative scenario

Coordinating a mullion with a duct penetration

In the shared model, a proposed duct penetration overlaps a mullion fixing zone. The example follows the decision through to the issue of the shop drawing.

3D illustration of a façade mullion and duct
Illustration generated for this scenario.
  1. Identify

    Clash location and disciplines involved

    Deliverable
    Coordination issue in the model

  2. Resolve

    Revised penetration position and required clearances

    Deliverable
    Answered RFI and updated model

  3. Issue

    Agreed detail and revision in force

    Deliverable
    Shop drawing for approval

Fabrication receives the approved revision with a single reference for the mullion, bracket and duct penetration.