← All guide topics

From performance brief to handover

A clear technical scope sets responsibility boundaries, performance requirements, submissions and acceptance criteria. Agree fabrication drawings, samples and, where needed, mock-ups and testing before production.

From performance brief to handover
EPIPHANY, Marousi · Façade works by TechnikAL.

What matters in practice

Handover should include applicable documentation, operation and maintenance instructions and clear warranty terms. TechnikAL connects detailed engineering with fabrication and installation so that design decisions can be delivered on site.

Approve before manufacture

Record requirements, drawing revisions and approval milestones. Assess late changes for cost, materials and programme before implementation. Use samples and mock-ups to establish clear visual and construction acceptance.

Quality records and handover

Organise inspections at material receipt, fabrication and installation. Connect the completed assemblies to drawings, applicable performance declarations and maintenance instructions. Traceability supports future intervention; it does not imply maintenance-free construction.