TECHNIKAL / ALUMINIUM GUIDE
In a stick system, the façade grid is assembled mainly on site before its infill is installed. A unitized approach brings prefabricated modules from the factory. The choice affects engineering, fabrication, transport, lifting and installation sequence.

Assess repetition, geometry, structural tolerances, movement and access. Neither approach is universally superior, and a fixed installation-time saving cannot be assumed across projects.
Unitized delivery requires early design decisions, controlled batches, transport protection and coordinated deliveries. Stick construction has a different site sequence. Compare access and lifting arrangements as well as material costs.
Define anchors, tolerances, inter-storey movement and seal continuity before production. Structural checks, joint details and test arrangements must relate to the actual zones and loads of the building.