Inspection and documentation from mock-up to handover
Inspection and test plans define what is checked, when it is checked and against which acceptance criteria. Depending on the package, checks cover mock-ups, materials, fabrication tolerances and critical installation stages.
We record inspections and deviations, track close-out and compile as-built drawings, certificates and maintenance instructions for handover.
Illustrative scenario
Watertightness testing and closing out deviations
A façade mock-up is checked against the project test plan. The example shows how a finding is recorded and linked to final acceptance.

| Control point | Evidence | Scenario status |
|---|---|---|
| Before testing | Approved method and mock-up condition record | Ready for test |
| Finding | Water ingress record and location on drawing | Open deviation |
| Retest | Photo of the correction and retest report | Closed following acceptance |
The final report links the finding to the corrective action, the retest and the drawing revision released to fabrication.