Logistics & installation

All capabilities

From packing to installation at the right workface

Labelling and packing are organised by zone and installation sequence. Transport and lifting plans account for access, handling equipment, temporary storage and available workfaces.

Before installation, we check surveys, fixing substrates and tolerances. The sequence is coordinated with adjacent trades and includes inspection before interfaces are closed.

Illustrative scenario

Installing panels with a single receiving area

On a constrained urban site, one area serves unloading and lifting in sequence. The plan is organised by delivery window and installation workface.

Crated façade panels in a site receiving area
Illustration generated for this scenario.
  1. Before arrival

    Issue the panel list in unloading order

    Check before proceeding
    Confirm the receiving area and workface readiness

  2. On receipt

    Inspect crates, labels and visible damage

    Check before proceeding
    Match items against the installation plan

  3. During installation

    Deliver each panel to its drawing position

    Check before proceeding
    Record installation and open items

If the workface is delayed, the coordinator updates the delivery sequence before the next batch is dispatched.