From packing to installation at the right workface
Labelling and packing are organised by zone and installation sequence. Transport and lifting plans account for access, handling equipment, temporary storage and available workfaces.
Before installation, we check surveys, fixing substrates and tolerances. The sequence is coordinated with adjacent trades and includes inspection before interfaces are closed.
Illustrative scenario
Installing panels with a single receiving area
On a constrained urban site, one area serves unloading and lifting in sequence. The plan is organised by delivery window and installation workface.

Before arrival
Issue the panel list in unloading order
Check before proceeding
Confirm the receiving area and workface readinessOn receipt
Inspect crates, labels and visible damage
Check before proceeding
Match items against the installation planDuring installation
Deliver each panel to its drawing position
Check before proceeding
Record installation and open items
If the workface is delayed, the coordinator updates the delivery sequence before the next batch is dispatched.