Before ordering, survey the existing opening, sills, levels, shutters, insect screens and shading. Establish how the old frame will be removed and how its replacement will connect to the building’s waterproofing and insulation.

A comparable quotation identifies system, opening type, glazing, hardware, finish, installation, waste removal and making good. Delivery and warranty terms should be clear. Energy-saving percentages should not be promised without supporting assessment.
Record needs and existing conditions, agree the full assembly and interfaces, complete the final survey before fabrication, then inspect support, seals, operation and making good during installation and handover.
Check removal, transport, shutters, insect screens, hardware, thresholds, waste disposal and finishes. A lower starting price may cover a different scope. Expected energy savings require a building assessment rather than a fixed percentage for every home.